The City of Bryan, Texas, is seeking bids for the construction of the Brushy Creek Substation. The project includes site work, concrete, grounding, electrical raceway systems, control building, steel, yard equipment, cable and accessories, power, lighting, and control devices, and field testing. The successful bidder will be responsible for performing the activities necessary to properly coordinate the equipment and work provided by subcontractors, scheduling and expediting delivery of equipment and materials, and special construction stages of coordination. The contractor will also be responsible for demolishing, removing, and disposing of all material as indicated on the drawings, including the existing control building and foundation, existing transformer and breaker foundations, and existing bus and bus supporting structures and foundations.
Key features of the project include:
* Site work, including grading, excavation, and concrete foundations
* Installation of electrical equipment, including transformers, circuit breakers, and switches
* Construction of a control building and installation of control and relay panels
* Installation of yard lighting, PT, and CT/PT junction boxes
* Testing and commissioning of all equipment and systems
* Landscaping and irrigation requirements
The project is expected to commence in July 2026 and be completed by January 28, 2028.