The US Air Force is seeking a contractor to repair the HVAC control system at Tinker Air Force Base in Oklahoma. The project involves furnishing design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the repair/replacement/addition of the HVAC controls and change to a BACNet system in B2122. The contractor shall perform a site investigation to verify existing conditions and identify necessary logistical, architectural, and structural work elements. Key aspects of the project include:
* Repair/replacement of HVAC controls
* Change to a BACNet system
* Site investigation to verify existing conditions
* Identification of necessary logistical, architectural, and structural work elements
* Furnishing design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals
The project requires a Tinker Honeywell partner at a minimum for SOW 4.2.1.3. If the respondent is only capable of being a general contractor, they must provide their average percentage for design, G&A, overhead, profit, and bonds, as well as a statement that Tinker Honeywell would be a required sub-contractor and an estimated percentage of how much of the required work would be performed with Tinker Honeywell as the prime sub-contractor.