Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›J059--Northampton VAMC – Fitchburg VA Community-Based…

U.S. Department Of Veterans Affairs·Maine

J059--Northampton VAMC – Fitchburg VA Community-Based Outpatient Clinic-Fiber Optic Cable Installation

Closes 2/14/2025$100k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Northampton Fiber Optic Cable Installation project involves installing fiber optic cable in the Philip J. Philbin Federal Office Building in Fitchburg, Massachusetts. The project requires running temporary fiber to the 3rd floor, and the intent is not to meet OIT infrastructure standards. The existing conduit can be used in some areas, but new conduit may be required in other areas. The project also involves coordinating with the VA patient hallways and waiting room, and ensuring compliance with VHA, NFPA, Joint Commission, NEC, and other regulations and guidelines. The project requires a self-performance level of 51% for SDVOSB set-aside awards. Some key aspects of the project include: • Utilizing existing conduit to exit the 1st floor IT room • Running fiber optic cable through the USPS loading dock • Coordinating work in Room 107, an active office • Ensuring containment measures are in place for drilling and other work • Complying with VHA, NFPA, Joint Commission, NEC, and other regulations and guidelines • Terminating all strands of the fiber optic cable on both ends • Meeting the 2-hour fire rating requirement for new penetrations

Attached files

Key dates

Opened
1/30/2025
Closes
2/14/2025

Last updated

Details

Type
Request for Proposal
Industry
Telecommunications
NAICS
238210
Solicitation №
36C24125Q0226

Budget estimate

$100,000 – $500,000

The budget for this project is likely to be in the range of $100,000 to $500,000, based on the scope of work and the requirements for fiber optic cable installation. The project involves running temporary fiber to the 3rd floor, which may require new conduit installation, drilling, and termination of fiber optic cables. The self-performance level requirement of 51% for SDVOSB set-aside awards may also impact the budget. The budget may be influenced by factors such as the length of the fiber optic cable, the number of penetrations required, and the need for containment measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Bay Transportation Authority·Massachusetts

Top match · 75%

IFB # 133-26: Furnish Fiber Optic Cable

Closes 11/4/2026Opened 10/8/2026

Oregon Northern Wasco County PUD·Oregon

73% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

Dakota County·Minnesota

73% match

Fiber Optic Outside Plant and Inside Plant Services

Closes 11/24/2026Opened 10/29/2026

Baltimore County, Maryland·Maryland

73% match

Fiber Optic Construction and Related Services

Closes 1/14/2027Opened 10/21/2026

Palm Beach County·Florida

72% match

PRE-QUAL FOR FIBER OPTIC CABLE

Closes 6/27/2029Opened 1/23/2026

Colby Community College·Kansas

72% match

Fiber Installation for Dorm and Maintenance Building (PDF)

Closes 12/1/2026Opened 10/16/2026

NYS Onondaga County·New York

72% match

FIBER OPTIC DESIGN AND OPTIONAL CONSTRUCTION MANAGEMENT

Closes 11/27/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

71% match

CABLE,FIBER OPTIC

Closes 11/13/2026Opened 10/27/2026

Department of Veterans' Affairs·South Carolina

71% match

Veteran Village - Fire Alarm Control Panel Fiber Install

Closes 11/3/2026Opened 10/27/2026

Maryland The Secretary’s Office·Maryland

71% match

Fiber Channel Switches

Closes 11/4/2026Opened 9/11/2026

Michigan Wayne-Westland Community School District·Michigan

71% match

DISTRICT FIBER UPGRADES

Closes 11/18/2026Opened 10/16/2026

Utility Board of the City of Key West·Florida

71% match

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026

Michigan Caledonia Community Schools·Michigan

70% match

RFP - District Fiber Renovations

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

70% match

PROVIDE, INSTALL, AND MAINTAIN A 1GB ETHERNET ACCESS BETWEEN VA AND VA

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Veterans Affairs·Illinois

70% match

N065--Slit Lamp Installation for the Captain James A. Lovell Federal Health Care Center (FHCC), located at 3001 Green Bay Rd., North Chicago, IL 60064.

Closes 11/13/2026Opened 10/26/2026

U.S. Department Of The Interior·California

70% match

Y--Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up

Closes 11/16/2026Opened 10/30/2026

State of North Dakota Information Technology Department·North Dakota

70% match

122-2707 Wiring & Fiber Placement Services

Closes 11/20/2026Opened 10/27/2026

Georgia Butts County Schools (Butts County School District)·Georgia

70% match

RFP - Fiber Optic WAN Service

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

70% match

60--CABLE,FIBER OPTIC

Closes 11/6/2026Opened 10/7/2026

Clemson University·South Carolina

70% match

Emergency Cable Repairs

Closes 2/27/2029Opened 3/20/2024

Columbia Public Schools·Missouri

70% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026

U.S. Department Of Veterans Affairs·Illinois

70% match

657A5-26-111, Triennial Electrical Testing

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Veterans Affairs·Maryland

70% match

Y1DA--512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric Sochor

Closes 11/5/2026Opened 10/21/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

69% match

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

Palm Beach County Purchasing Department·Florida

69% match

RPQ FIBER OPTIC CABLE, PURCHASE AND DELIVERY, TERM CONTRACT

Closes 3/21/2029Opened 2/5/2024