The Muskrat Water Well Repair project involves repairing an existing water well. The project requires perforating the existing 6" casing, installing a new 5" steel casing, and ensuring the perforations are open and functional. The contractor will need to lower the new casing without driving it. The project also involves addressing the buildup of rust and calcium deposits on the existing casing.
Some key points to consider include:
• The existing casing is already perforated in the required intervals.
• A gravel pack is not required due to the buildup of rust and calcium deposits.
• The new casing is expected to be lowered without driving.
• The project requires careful consideration of the well's formation, which consists of sand, gravel, cobbles, and boulders.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.