The project involves replacing SCI steam coils at a VA facility. The scope of work includes providing temporary feeds to panel circuits, replacing panel boards, and installing new electrical equipment. The contractor will need to coordinate with the facility to schedule downtime for critical equipment and ensure that the temporary feeds are properly sized and installed. The contract will require the contractor to provide a detailed schedule and estimate of downtime for crucial equipment.
• The contractor must provide a 3P100a circuit fed from E10A-AC ckt # 42,44,46 for the new HWP-507 water pump.
• The contractor must provide 15A-3P breakers for the new HGP-1 and HGP-2 pumps.
• The contractor must provide a 15A-1P circuit for the glycol makeup system.
• The contractor must coordinate with the electrical subcontractor to determine the conductor and conduit size for the HWP-507 circuit.
• The contractor must ensure that the temporary feeds are properly sized and installed to avoid downtime for critical equipment.