Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Environmental Services
  5. ›Saenger Theater Kitchen - Environmental Remediation

Awarded contract·City of Mobile·Alabama

Saenger Theater Kitchen - Environmental Remediation

Won by Gulf Services Contracting$30kSingle Award
Contract source

Awarded vendors

  • Gulf Services Contracting

Description

This contract awards Gulf Services Contracting the task of environmental remediation for the Saenger Theater Kitchen in Mobile, AL. The scope includes demolition of interior finishes, HEPA‑vacuum cleaning, disinfection, and encapsulation of all affected areas, with a required 15‑day execution window after notice to proceed. The City of Mobile’s Building Services Department manages the solicitation, requiring mandatory attendance at a pre‑quote conference and compliance with EPA/IICRC standards, insurance, and E‑Verify requirements. An allowance of $2,500 is set aside for unforeseen remediation work, and bid security applies only if the total bid reaches $10,000. The procurement was conducted via an RFQ (open competition) with a submission deadline of 6 Nov 2019. • Scope: demolition, HEPA‑vacuum cleaning, disinfecting, and encapsulation of kitchen interior. • Term: 15 calendar days from notice to proceed, with a $2,500 contingency allowance. • Requirements: PPE, air scrubbers (≥ 4 ACH), insurance, E‑Verify, and bid security if bid ≥ $10k.

Attached files

Key dates

Bids closed
11/6/2019
Duration
15 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Environmental Services
NAICS
562910
Solicitation №
SR-010-20

Contract value

$30,000

The award amount is not disclosed, but the scope—demolition of interior finishes, HEPA‑vacuum cleaning, disinfecting, and encapsulation of a theater kitchen—suggests a moderate‑size remediation project. Comparable municipal remediation contracts for similar-sized facilities typically range from $20,000 to $50,000 depending on labor rates, equipment rental (air scrubbers, HEPA units), disposal fees, and contingency allowances. Considering the $2,500 allowance for unforeseen conditions and the potential need for specialized PPE and containment, a reasonable midpoint estimate would be approximately $30,000. This figure assumes standard local labor costs in Alabama, moderate debris disposal fees, and the short 15‑day contract term.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

East Brunswick Public Schools·New Jersey

Top match · 65%

Kitchen and Multipurpose Room Renovations at Warnsdorfer ES

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

64% match

ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD TASK ORDER CONTRACT W912P9

Closes 11/12/2026Opened 10/28/2026

Connecticut City of Norwich·Connecticut

64% match

Greeneville Fire House Mold Remediation

Closes 11/5/2026Opened 10/7/2026

East Brunswick Public Schools·New Jersey

64% match

Kitchen and Multipurpose Room Renovations at Frost ES

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·North Carolina

63% match

Clean cooking exhaust

Closes 11/5/2026Opened 10/28/2026

U.S. Department Of The Interior·Florida

63% match

Mold remediation, Merritt Island NWR

Closes 11/16/2026Opened 10/29/2026

City of Hollywood·Florida

63% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Hawaii Department of Defense·Hawaii

63% match

Mold removal and deep cleaning inside Bldg. 1784 ground, second, and third floor interior surfaces

Closes 11/4/2026Opened 10/19/2026

Fox Valley Technical College·Wisconsin

63% match

Restroom Remodel – Service Motor Company Agriculture Center

Closes 11/2/2026Opened 10/7/2026

University of Wisconsin-Eau Claire·Wisconsin

63% match

Kitchen Exhaust System Cleaning Services

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

63% match

SB ERS MATOC, USACE Northwestern Division and EPA Region 2

Closes 11/16/2026Opened 9/29/2026

New York City Department of Environmental Protection·New York

62% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

Los Angeles County Sanitation Districts·California

62% match

ENVIRONMENTAL ANALYTICAL LABORATORY SERVICES

Closes 11/30/2026Opened 10/31/2026

University of Wisconsin Eau Claire·Wisconsin

62% match

Kitchen Exhaust System Cleaning Services

Closes 11/3/2026Opened 10/2/2026

Kansas Department of Health and Environment·Kansas

62% match

Remediation Laboratory Services

Closes 12/8/2026Opened 10/26/2026

City of Green Bay·Wisconsin

62% match

Stationary Industrial Vacuum System

Closes 11/24/2026Opened 10/22/2026

Detroit Public Schools Community District - Procurement Department·Michigan

61% match

Adaptive Reuse of Former School Facilities

Closes 11/13/2026Opened 10/24/2026

U.S. Department Of Defense·United States of America

61% match

Region 7 Southeast Mines Superfund Site

Closes 11/6/2026Opened 10/21/2026

Eden Prairie Schools·Minnesota

61% match

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026

Village of Wellington·Florida

61% match

Water Reclamation Facility Sodium Hydroxide Storage Area Modifications

Closes 11/18/2026Opened 10/16/2026

Village of Wellington·Florida

61% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 11/12/2026Opened 9/29/2026

City of Madison - Purchasing Services·Wisconsin

61% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/2/2026Opened 9/29/2026

City of Madison·Wisconsin

61% match

Ecological Restoration and Maintenance

Closes 11/2/2026Opened 9/29/2026

City of Chicago·Illinois

61% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Madison - Purchasing Services·Wisconsin

61% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/3/2026Opened 10/6/2026