The Nacimiento Water Project Temporary Repair contract involves the installation of restraint joints to the current temporary piping to restore flow to the City. The project includes mobilization, demolition, temporary shoring, excavation, backfill, and compaction of existing material, as well as the installation of mechanical joint restraints and safety fencing. The contract was awarded to five vendors: RCH Construction, Whitaker Construction Group, Inc., Seamair Construction, Inc., AAAA Engeineering Contracting Inc., and REHAK General Engineering. The engineer's estimate for the project is $314,500.00.
• The project requires the installation of restraint joints to the current temporary piping.
• The project includes mobilization, demolition, temporary shoring, excavation, backfill, and compaction of existing material.
• The project requires the installation of mechanical joint restraints and safety fencing.
• The contract was awarded to five vendors.
• The engineer's estimate for the project is $314,500.00.