The City of Palm Bay is seeking a new 750 eKW generator for the Palm Bay Utilities Wastewater Treatment Plant. The generator must meet the minimum specifications detailed in the request for proposal. The contract was awarded to one of the two vendors, Florida Detroit Diesel or Ring Power Corporation, with a grand total of $112,000.00 and $90,436.00 respectively.
• The contract is for a single 750 eKW generator
• The generator must meet the minimum specifications detailed in the request for proposal
• The contract was awarded to one of the two vendors, Florida Detroit Diesel or Ring Power Corporation
• The grand total for the contract is $112,000.00 and $90,436.00 respectively