CAL FIRE is procuring a comprehensive replacement of the water storage and distribution system at the Tollhouse Fire Center. The contractor must provide all labor, materials, equipment, permits, and fees to demolish the existing tank and lines, construct a new concrete pad, install a 345,000‑gallon bolted‑steel water tank, lay approximately 1,800 ft of 10‑in. PVC water line and 100 ft of 6‑in. PVC water line, install six fire hydrants with protective bollards, replace curb and asphalt berm, install fencing, and develop a Stormwater Pollution Prevention Plan. The work must comply with prevailing‑wage rules, require an A‑General Engineering license, DIR registration, bid and payment bonds, and extensive insurance and certification (DVBE, SB, economic‑sanctions, etc.).