The contract is for a Watershed Study, specifically the Piney Run Watershed Study. The purpose of the study is to identify qualified firms to assist the Carroll County Bureau of Resource Management with the creation of a Watershed Project Plan. The contract was awarded to AECOM for $450,000. The scope of work includes engineering design for deficiencies and ultimately construction of mitigation solutions at the Piney Run Dam. Some key points about the contract include:
• The contract is for a specific project, the Piney Run Watershed Study
• The contract was awarded to AECOM
• The contract amount is $450,000
• The scope of work includes engineering design and construction of mitigation solutions
• The contract is for a specific location, the Piney Run Dam in Carroll County, Maryland