Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Idaho guideIdaho Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Idaho
  4. ›Construction
  5. ›West Boise Water Renewal Facility Flare Replacement (WBP…

Awarded contract·City of Boise·Idaho

West Boise Water Renewal Facility Flare Replacement (WBP 158)

Won by YMC, Inc. +2 more$398kMultiple Award
Contract source

Awarded vendors

  • YMC, Inc.
  • Lacy Mechanical, Inc.
  • Record Steel and Construction, Inc. dba RSCI

Description

The City of Boise is seeking bids for the procurement and installation of a new waste gas burner, commonly referred to as a flare, at the West Boise Water Renewal Facility. The work includes demolition and removal of the existing waste gas burner. The bid documents and specifications can be found on the City of Boise Vendor Portal. The contract was awarded to one of the three vendors listed in the bid tabulation sheet. • The scope of work includes procurement and installation of a new waste gas burner. • The work includes demolition and removal of the existing waste gas burner. • The City of Boise reserves the right to reject any and all bids. • A bid security in the form of a bid bond, certified check, cashier’s check, or cash in the amount of 5% of the bid amount is required. • Bids will be received electronically via the JAGGAER Platform.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
FB-2024-008

Contract value

$398,210

Based on the bid tabulation sheet, the total bid amounts for the three vendors are: $398,210.00, $470,900.00, and $635,000.00. The contract value is likely to be one of these amounts, but without further information, it is difficult to determine which one. Assuming the lowest bid was accepted, the contract value would be approximately $398,210.00.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Massachusetts Town of West Springfield·Massachusetts

Top match · 68%

Explosion Proof Light Replacement

Closes 11/6/2026Opened 10/9/2026

Town of Bridgton·Maine

66% match

RFPs Requested – Town Boiler System Replacement

Closes 11/10/2026Opened 10/14/2026

City of Beaumont·California

65% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

City of Hollywood·Florida

65% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Lake City·Minnesota

65% match

Lake City, City of – WWTF UV Disinfection Replacement

Closes 11/5/2026Opened 10/16/2026

Massachusetts Town of Westborough·Massachusetts

65% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Western Virginia Water Authority·Virginia

65% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

U.S. Department Of Defense·Oregon

64% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·Mississippi

64% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

City of Bedford, TX·Texas

64% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

Oregon Clackamas County·Oregon

64% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Oregon Tualatin Valley Water District·Oregon

64% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

The City of Columbus·Ohio

64% match

RFQ033962 - Berliner Lighting Emergency Improvements

Closes 11/4/2026Opened 6/27/2023

Town of Narragansett·Rhode Island

64% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

Palm Beach County Water Utilities Department·Florida

63% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/16/2026

City of San Clemente·California

63% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

City of San Diego·California

63% match

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

63% match

Key No. 24698 DISCOVERY WAY, US 20/26 TO BRIDGER ST, BOISE

Closes 11/10/2026Opened 10/14/2026

City of Austin·Texas

63% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

City of Redlands·California

63% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Hollywood·Florida

63% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Vista·California

63% match

Wave Waterpark Restroom Remodel Project

Closes 11/17/2026Opened 10/27/2026

City of Dayton, Ohio·Ohio

63% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

Metropolitan Council·Minnesota

63% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026