The Point of Rocks Stream Restoration Phase II project involves the stabilization of an unnamed tributary to the Potomac River using Natural Channel Design techniques and the decommissioning of a stormwater management pond. The project also includes the installation of a pedestrian bridge. The contract was awarded through an Invitation for Bid (IFB) process, and a preliminary bid tabulation is provided. The project is part of Frederick County's Capital Improvement Project and aims to meet the watershed restoration and impervious area reduction requirements of the National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) permit. Key aspects of the project include:
• Stream restoration and stabilization
• Pond decommissioning
• Installation of a pedestrian bridge
• Meeting NPDES MS4 permit requirements
• Part of Frederick County's Capital Improvement Project