Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Smart Irrigation Controllers & Master Valve/Flow Sensor…

Awarded contract·County of Orange·California

Smart Irrigation Controllers & Master Valve/Flow Sensor with Professional Services

$300kSingle Award
Contract source

Description

The County of Orange is seeking a contractor to provide smart irrigation controllers and master valve/flow sensor with professional services. The contract is expected to start on May 19, 2025, and end on May 18, 2026, with a duration of one year. The contract is currently in the invitation for bid (IFB) stage. Key aspects of the contract include the provision of irrigation systems and equipment, as well as professional services. The contract is funded by local sources. Some key points to consider include: • The contract is for the provision of smart irrigation controllers and master valve/flow sensor with professional services. • The contract is expected to start on May 19, 2025, and end on May 18, 2026. • The contract is currently in the invitation for bid (IFB) stage. • The contract is funded by local sources. • The County of Orange is seeking a contractor to provide irrigation systems and equipment, as well as professional services.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
5/19/2025
Ends
5/18/2026
Duration
1 years

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
333319
Solicitation №
TBD

Contract value

$300,000

The contract value is not explicitly stated in the provided text. However, based on the scope of work, which includes the provision of smart irrigation controllers and master valve/flow sensor with professional services, it can be estimated that the contract value may be in the range of $100,000 to $500,000. This estimate is rough and may vary depending on the specific requirements of the contract. Factors that may influence the contract value include the number of irrigation systems to be installed, the complexity of the work, and the level of professional services required.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Department of Transportation·California

Top match · 73%

Smart Controller and Automatic Landscape Irrigation System Repair and Maintenance Services

Closes 11/10/2026Opened 10/22/2026

Columbus Consolidated Government·Georgia

68% match

On-Call Irrigation Installation and Maintenance Services (Annual Contract)

Closes 11/18/2026Opened 8/11/2026

City of Pasadena·California

66% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

U.S. Department Of Defense·Louisiana

66% match

3-Way Control Valve and Controls for the U.S. Dredge Wheeler

Closes 11/2/2026Opened 9/22/2026

Town of Lexington·South Carolina

66% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

Massachusetts City of Melrose·Massachusetts

66% match

Annual Service Contract for Irrigation Maintenance and Repairs

Closes 11/12/2026Opened 10/22/2026

City of Troy, OH·Ohio

66% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

City of Troy, OH·Ohio

66% match

Miami Shores Golf Course Irrigation System Renovation Project

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

65% match

VALVE, FLOW CONTROL

Closes 11/5/2026Opened 10/6/2026

Columbus Consolidated Government·Georgia

65% match

ON-CALL IRRIGATION INSTALLATION AND MAINTENANCE SERVICES (ANNUAL CONTRACT)

Closes 11/18/2026Opened 8/11/2026

U.S. Department Of Defense·Massachusetts

65% match

RFI Process control system plumbing and programming

Closes 11/26/2026Opened 10/27/2026

City of Colorado Springs·Colorado

65% match

Parks On-Call Irrigation Repairs

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Defense·Florida

65% match

Small Business Set Aside for Sierra Instruments Brand Mass Flow Controller per attachments

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

65% match

VALVE, FLOW CONTROL

Closes 11/5/2026Opened 10/6/2026

Louisiana Jefferson Parish·Louisiana

64% match

Purchase of Actuators for the Jefferson Parish Drainage Department

Closes 12/1/2026Opened 10/28/2026

Town of Lexington·South Carolina

64% match

Services for Potable Water System Hydraulic Modeling and Program Management

Closes 11/5/2026Opened 9/16/2026

El Paso Water·Texas

64% match

On-Call Professional Engineering Services for Mechanical, Electrical, and Plumbing Engineering Services for Water, Wastewater, Reclaimed Water, Stormwater, and Administrative Facilities

Closes 12/2/2026Opened 10/25/2026

The School Board of Broward County, FL - Procurement & Logistic Operations·Florida

64% match

Automated External Defibrillator (AED) Ecosystem with Connected Technology and Fleet Management

Closes 11/13/2026Opened 10/30/2026

City of Phoenix·Arizona

64% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

City of Port St. Lucie·Florida

64% match

Notice to Sole Source Actuators for Water and Wastewater Facilities

Closes 11/9/2026Opened 10/29/2026

Georgia City of Carrollton·Georgia

63% match

WTP SCADA and Filter Control System Improvements

Closes 12/3/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

63% match

Valve, Linear, Directional Control

Closes 11/30/2026Opened 10/20/2026

Massachusetts Town of Kingston·Massachusetts

63% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Contra Costa Water District·California

63% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

City of Tucson·Arizona

63% match

Qualified Vendor List (QVL) for Green Stormwater Infrastructure (GSI) Landscape Maintenance

Closes 4/10/2030Opened 4/10/2025