This contract is a design‑build, fixed‑price award for the reconstruction and re‑configuration of three airport taxiway sections at Cleveland‑Hoping Airport (Taxiway A, Taxiway A3, and Taxiway B connectors B2‑B4). The work includes full civil‑engineering construction—excavation, pavement removal, sub‑base preparation, concrete paving, and related utilities—to meet Federal‑Aid and Davis‑Bacon requirements.
• Scope: Reconfigure Taxiway A (5,400 ft × 35 ft), Taxiway A3 (263 ft × 35 ft), and reconstruct Taxiway B connectors B2, B3, B4 (each 263 ft × 35 ft).
• Eligibility: Only Ohio Department of Transportation (ODOT) pre‑qualified contractors may submit bids.
• Financials: Estimated total cost $15.45 M; 10 % bid guarantee required ($1.545 M) in bond or cash form.
• Timeline: Pre‑bid conference March 27 2025; bid deadline April 16 2025 (2 PM); contract status now “Awarded” (vendor not disclosed).