The contract is for the furnishing and installation of a new 125kw diesel engine driven emergency power generator set at the City's Turnpike Reclamation Facility. The work includes the installation of a slab on grade, connection to designated emergency circuits, and testing of the generator. Other related work includes grading, removal and installation of chain link fence, replacement of vegetation, and identification of pipes and conduits. The contract was awarded to Shine and Company and Zabatt Power Systems.
• The contract includes the installation of a new generator and related work.
• The work is to be performed at the City's Turnpike Reclamation Facility.
• The contract was awarded to two vendors, Shine and Company and Zabatt Power Systems.
• The preliminary bid tabulation lists the total base bid amounts for each vendor.
• The contract is for the furnishing and installation of a new 125kw diesel engine driven emergency power generator set.