The contract is for the replacement of an existing 1750kw generator at the Orange County Data Center with a new one. The project includes modification to existing concrete pads, installation of a new generator controller, ATS, day tank and pump, load bank, charger cooler and pump, radiator, batteries, battery charger, and miscellaneous accessories/equipment. The contract also includes pre-construction services such as participation in design review process, detailed cost estimating, project planning and scheduling, conduct alternate systems evaluation, and assist in constructability studies. The contract value is $89,241.00, and the construction services profit margin is 8%. The contract duration is 3 years, from October 22, 2024, to October 21, 2027.
• The project is located at 1400 S. Grand Ave., Santa Ana, CA.
• The existing generator is over 30 years old and needs to be replaced.
• The project includes temporary generator installation while the existing generator is removed and the new generator is installed.
• The contract includes a pre-construction services fee of $84,741.00 and a CMARE's pre-construction contingency of $4,500.00.
• The contract requires compliance with Labor Code Sections 1771 et seq. and payment of prevailing wages to workers employed on the contract.