Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Civil Engineering
  5. ›SCHANEN DITCH IMPROVEMENTS PHASE 2

Awarded contract·City of Corpus Christi·Texas

SCHANEN DITCH IMPROVEMENTS PHASE 2

Won by ADK Environmental Inc. +3 more$678kMultiple Award
Contract source

Awarded vendors

  • ADK Environmental Inc.
  • Saenz Brothers Construction
  • JE Construction Services
  • Balinas Const

Description

The contract is for the Schanen Ditch Improvements Phase 2 project, which includes improvements to the lower reach of Schanen Ditch, a major drainage channel for the City of Corpus Christi. The project elements include improved outfalls into the channel with new headwalls, wingwalls, reinforced concrete pipe, and rip-rap, as well as excavation and grading to address existing sloughed or damaged areas of the channel. The engineer's estimate for the construction cost is $580,680. The contract was awarded through a public bid opening process, and the bid results worksheet lists several contractors who submitted bids. • The project includes improvements to the lower reach of Schanen Ditch • The project elements include improved outfalls, excavation, and grading • The engineer's estimate for the construction cost is $580,680 • The contract was awarded through a public bid opening process • Several contractors submitted bids for the project

Attached files

Key dates

Duration
110 days

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237990
Solicitation №
E11073

Contract value

$678,276

The engineer's estimate for the construction cost is $580,680. This value is likely to be the basis for the contract award, and it can be used as a rough estimate of the contract value. However, the actual contract value may be higher or lower, depending on the bids submitted by the contractors. Based on the bid results worksheet, the lowest bid was $678,276, and the highest bid was $1,058,615.18. Therefore, the contract value is likely to be around $678,276 to $1,058,615.18.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Lebanon·Indiana

Top match · 64%

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Mason·Ohio

63% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

U.S. Department Of Defense·Missouri

63% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·South Dakota

62% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Lakesong Municipal Management District No. 1 of Ellis County·Texas

62% match

Lakesong Boulevard, Phase 2 Landscape Public Bid

Closes 11/4/2026Opened 10/19/2026

City of Ankeny·Iowa

62% match

Westlawn Place Area Utility Improvements - Phase 2A

Closes 11/10/2026Opened 10/21/2026

Park County Public Works·Wyoming

62% match

Willwood Road Improvements Project- Phase 2 Culverts

Closes 11/16/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

62% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Oldsmar·Florida

61% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

Town of Camp Verde·Arizona

61% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Calhoun County Board of County Commissioners·Florida

61% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Town of Upton·Wyoming

61% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

Minnesota Department of Natural Resources·Minnesota

61% match

State Fair Fire Prevention Building Drainage Correction

Closes 11/17/2026Opened 10/29/2026

Lucas County Engineer·Ohio

61% match

2026 Springfield Township O.P.W.C. Road Improvement Project, Phase 2

Closes 11/10/2026Opened 10/26/2026

Town of Medfield·Massachusetts

61% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

City of Charlotte·North Carolina

61% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Santa Clara Valley Water District·California

61% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

U.S. Department Of Defense·Texas

61% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

City of North Charleston·South Carolina

61% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Idaho Transportation Department·Idaho

61% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

City of Fort Wayne·Indiana

60% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Ohio City of Westerville·Ohio

60% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026