The contract is for the replacement of pumps 7 and 8 at the Central Plant, with an initial contract sum of $117,691.25. A change order was issued to add $2,954.48 to the contract sum, bringing the total to $120,645.73. The contract was awarded to The Brandt Companies, LLC, and is set to expire on April 15, 2026. The scope of work includes the fabrication and installation of a 6" Schedule 40 Pipe Spool, as well as repairs to deteriorated piping to ensure a leak-free pump replacement.
• The contract was awarded through a cooperative procurement process.
• The contract includes a change order provision, which allows for modifications to the contract sum and scope of work.
• The contract has a fixed expiration date, and there is no indication of renewal or extension.
• The vendor is required to perform the work in accordance with the contract terms and conditions, and to ensure a leak-free pump replacement.