The contract is for the construction of a redundant treated water reservoir and pump station at the fluoride removal plant. The work includes the construction of a new pump station building, a new bolted steel water reservoir, and site work such as inlet and outlet piping, asphalt concrete paving, and concrete pads. The contract also includes mechanical work, electrical work, and testing and training. The total bid price for the project is $3,968,239. The project is located in Twentynine Palms, California, and the contractor is Canyon Springs Enterprises.
• The project includes the construction of a new pump station building and a new bolted steel water reservoir.
• The site work includes inlet and outlet piping, asphalt concrete paving, and concrete pads.
• The mechanical work includes the installation of two 300 HP vertical turbine pumps and associated piping and valves.
• The electrical work includes the installation of electrical conduits and wiring for the pump station and reservoir.
• The project also includes testing and training for the new equipment and systems.