Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Architecture
  5. ›Water Department Main Campus - Office…

Awarded contract·City of Spokane·Washington

Water Department Main Campus - Office Renovation/Reconstruction Design and Construction Management Services

Won by Integrus Architecture$7.5MAwarded 10/21/2023Single Award
Contract source

Awarded vendors

  • Integrus Architecture

Description

This contract awards design‑ and construction‑management services for the renovation and reconstruction of the Water Department’s Main Campus office facilities in Spokane, Washington. The City seeks a qualified architectural/engineering firm to develop design documents, prepare bid packages, act as the owner’s representative, and manage phased construction, integrating historic masonry preservation with high‑efficiency mechanical systems. The scope includes two existing buildings, a new connector, demolition of an old parking structure, site‑work, and full mechanical, electrical, plumbing, and fire‑protection design. The contract is for a four‑year period, with the City retaining the option to renew. • Design services for two historic office buildings and a new connector. • Owner’s‑representative and construction‑management functions across multiple phases. • Integration of water‑source heat‑pump VRF HVAC, DOAS, low‑flow plumbing, LED lighting, and code‑compliant fire protection.

Attached files

Key dates

Bids closed
5/15/2023
Intent to award
10/21/2023
Awarded
10/21/2023
Contract modified
5/1/2023
Duration
4 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310
Solicitation №
RFQu 5873-23

Contract value

$7,500,000

The master‑plan cost estimate attached to Addendum 3 indicates a base construction cost of approximately $6.4 million (escalated to $6.4 M after applying a 9 % escalation to Q3 2024). Adding typical design‑consultant fees (≈10‑12 % of construction cost) and a modest contingency for the four‑year contract suggests a total contract value in the range of $7 million to $8 million. Given the lack of a disclosed budget, a reasonable ball‑park figure for the awarded contract is therefore about $7.5 million. Factors influencing this estimate include the historic preservation requirements, high‑efficiency HVAC system, and the extensive site‑work scope.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Ferris State University·Michigan

Top match · 72%

Allied Health Renovation Pre-Construction & Construction Management Services

Closes 11/5/2026Opened 10/15/2026

University of North Dakota·North Dakota

72% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

New York City Department of Design and Construction·New York

72% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

New York City Department of Design and Construction·New York

72% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

Massachusetts CITY OF WATERTOWN·Massachusetts

72% match

Exterior Monumental Stair Restoration/Reconstruction Design

Closes 11/12/2026Opened 10/28/2026

University of North Dakota·North Dakota

71% match

FM362 UND SMHS Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

State University of New York (SUNY)·New York

71% match

Roosevelt Hall Renovations-Design Services

Closes 11/19/2026Opened 10/28/2026

The University of North Carolina·North Carolina

71% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

University of North Texas System·Texas

70% match

RFQ769-27-1028CS Sycamore Hall Stewardship Renovation

Closes 11/20/2026Opened 10/21/2026

Lansing Board of Water & Light·Michigan

70% match

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations (Dunlap, Astor, Berry, Palmer, Tenny

Closes 11/24/2026Opened 10/23/2026

Texas City of San Antonio·Texas

70% match

Main Plaza Renovations

Closes 12/1/2026Opened 10/16/2026

City of Charlotte·North Carolina

70% match

Brookshire Building Renovations

Rolling / TBD closeOpened 10/1/2027

City of Bellevue·Washington

70% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Ontario·California

70% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Town of Eatonville·Florida

70% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Massachusetts State College Building Authority·Massachusetts

70% match

RFQ/P Design and Construction Management Services - Framingham State University - Linsley Hall Repurposing

Closes 11/4/2026Opened 10/14/2026

Florida Keys Aqueduct Authority·Florida

70% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

70% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

University of Louisville·Kentucky

69% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

City of Hialeah, FL·Florida

69% match

Building Division & Associated Services Expansion of the City Hall Campus

Closes 11/11/2026Opened 10/9/2026

Fort Pierce Utilities Authority·Florida

69% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

City of Fargo·North Dakota

69% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

New York City Department of Design and Construction·New York

68% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

Town of Lexington·South Carolina

68% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

City of DeLand·Florida

68% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026