This contract awards design‑ and construction‑management services for the renovation and reconstruction of the Water Department’s Main Campus office facilities in Spokane, Washington. The City seeks a qualified architectural/engineering firm to develop design documents, prepare bid packages, act as the owner’s representative, and manage phased construction, integrating historic masonry preservation with high‑efficiency mechanical systems. The scope includes two existing buildings, a new connector, demolition of an old parking structure, site‑work, and full mechanical, electrical, plumbing, and fire‑protection design. The contract is for a four‑year period, with the City retaining the option to renew.
• Design services for two historic office buildings and a new connector.
• Owner’s‑representative and construction‑management functions across multiple phases.
• Integration of water‑source heat‑pump VRF HVAC, DOAS, low‑flow plumbing, LED lighting, and code‑compliant fire protection.