This contract is a public rebid for the complete modernization of the two‑stop hydraulic passenger elevator in the Alumni House building at Wayne State University. The scope includes demolition of the existing system, installation of new hydraulic machinery, controls, door equipment, pit and machine‑room upgrades, and related building work such as temporary facilities, safety controls, and warranty documentation. The university awarded the contract to Lardner Elevator following an open competitive bid process, with a final electronic submission deadline of June 27 2024. The project requires compliance with WSU wage schedules, extensive insurance and bonding, and adherence to ASME A17.1/A17.2, local building codes, and university safety policies.
• Turn‑key elevator modernization (hydraulic system, machine‑room, hoistway, car equipment).
• Mandatory performance & payment bonds (100 % of award), insurance, certified payroll, and WSU wage rates.
• Required coordination with university facilities, public safety, and C&IT for a security‑camera addendum; includes a 1‑year warranty and 1‑year preventive‑maintenance period.