The contract is for the replacement of HVAC and controls systems at the Santa Fe Depot, City Hall, and Reed Aviation Building. The contract was awarded to TDIndustries with a total bid price of $678,931.00. The scope of work includes the replacement of HVAC and controls systems at the three locations.
• The contract includes the replacement of HVAC and controls systems at the Santa Fe Depot, City Hall, and Reed Aviation Building.
• The contract was awarded to TDIndustries with a total bid price of $678,931.00.
• The scope of work includes the replacement of HVAC and controls systems at the three locations.