This contract is for the replacement of the 113th Street/Sands Point Drive Bridge and the Madonna Blvd Bridge in Pinellas County, Florida. The contract was awarded to Kisinger Campo & Associates, Corp (KCA) for a term of approximately 4 years, with a total budget of $1,080,276. The contract involves professional engineering services for the design and construction of the bridges. Key points of contact include Pamela Ulrich, the Lead Procurement Analyst, and Richard J. Harrison, P.E., as well as Kelli Hammer Levy, the Director of the Public Works department.
• The contract includes a detailed scope of work for the replacement of the bridges.
• The contract has a term of approximately 4 years.
• The total budget for the contract is $1,080,276.
• The contract involves professional engineering services for the design and construction of the bridges.