Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Design-Builder for Cleveland Metroparks Mastick Road…

Awarded contract·Cleveland Metroparks·Ohio

Design-Builder for Cleveland Metroparks Mastick Road Connector, Rocky River Reservation

Won by Nerone & Sons, Inc. +2 more$1.1MMultiple Award
Contract source

Awarded vendors

  • Nerone & Sons, Inc.
  • Pinnacle Construction & Development Group, Inc.
  • Schirmer Construction LLC

Description

The contract is for the design and construction of a 10-foot wide all-purpose trail along Mastick Road between Eaton Road and Valley Parkway. The project involves construction layout and staking, subsurface evaluations, retaining wall design, and other work items. The estimated project cost is $1.1M. The key information about this contract includes the scope of work, the estimated cost, and the vendors involved in the bid process. Some of the key work items include: • Construction layout and staking by a Surveyor registered as such by the State of Ohio. • Subsurface evaluations and retaining wall design • Design of alignment, profile, cross sections, drainage, select tree removal, cut and fill to meet current AASHTO bicycle facility guidelines and other applicable design criteria. • Design of structures (i.e. trail bridges) • Coordination with the City of Fairview Park for general project coordination and any work proposed within the Mastick Road Right of Way and coordination with Cuyahoga County Department of Public Works for modifications to the newly constructed Mastick Road Bridge. • Clearing and grubbing, including tree and stump removal. • Excavation and embankment to achieve design alignment profile, including compaction testing and inspection. • Undercut and stabilize unsuitable subgrade. • Installation of subbase stone, asphalt pavement, retaining walls, bridges, and drainage improvements. • Installation of accessible curb ramps. • Installation of signage and striping. • Installation of landscaping grass, shrubs and trees. • Commitment to safety, cleanliness, respect of environment, project neighbors, and the public

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
6608

Contract value

$1,100,000

The estimated project cost is $1.1M, which is provided in the contract description. This value is likely to be the total contract value, as it includes all the work items and services required for the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Cleveland·Ohio

Top match · 76%

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

Missouri Department of Transportation·Missouri

72% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

Camden County·New Jersey

72% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Kearney·Missouri

71% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Georgia Cobb County Department of Transportation·Georgia

71% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

Georgia City of Port Wentworth·Georgia

71% match

City of Port Wentworth Mobley Park Renovation

Closes 11/13/2026Opened 9/28/2026

City of Cleveland·Ohio

71% match

Active Transportation Quick Build Design Services

Closes 11/10/2026Opened 10/14/2026

City of Cincinnati·Ohio

70% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Georgia Cobb County Department of Transportation·Georgia

69% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Plano·Texas

69% match

RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033

Closes 12/9/2026Opened 10/26/2026

County of Chester·Pennsylvania

68% match

Struble Trail Extension to Marsh Creek State Park

Closes 11/4/2026Opened 9/25/2026

Oregon Clackamas County·Oregon

68% match

RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Closes 12/3/2026Opened 10/29/2026

City of Pinellas Park·Florida

68% match

Teen Center Design Build Skate Park RFQ

Closes 11/3/2026Opened 9/28/2026

City of Martinsburg·West Virginia

68% match

Martinsburg Skate Park

Closes 12/3/2026Opened 10/15/2026

Cincinnati Office of Strategic Growth·Ohio

68% match

BuildReady

Closes 11/13/2026Opened 10/7/2026

Texas Parks & Wildlife Department·Texas

68% match

P# | Centennial Program | New Park Development | Silver Lake State Park

Closes 11/3/2026Opened 9/14/2026

The City of Columbus·Ohio

68% match

RFQ033802 - Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/8/2026

City of Charlotte·North Carolina

68% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

Southern California Regional Rail Authority·California

68% match

Systemwide Signage and Wayfinding Master Plan

Closes 12/2/2026Opened 10/29/2026

City of Fresno·California

68% match

River West Fresno Eaton Trail Extension Phase 1

Closes 11/20/2026Opened 10/21/2026

Alaska Department of Transportation & Public Facilities·Alaska

68% match

RTP Grant Application - Wil Maamxsga Pts'aan Park Phase III

Rolling / TBD closeOpened 9/24/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

68% match

Rockwood Hall Entrance at Rockwood Hall of Rockefeller State Park Preserve

Closes 11/19/2026Opened 10/15/2026

City of Cincinnati·Ohio

68% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026