This contract concerns the complete replacement of the College Road Pump Station in Dover, Delaware, encompassing demolition, excavation, pipe installation, electrical work, site improvements, and related civil‑construction tasks. The award went to Teal Construction, which will handle a multi‑discipline scope valued at roughly $560 k. Key elements include:
• Full demolition of existing pump‑station structures and disposal of obsolete equipment.
• Installation of new 4‑in. ductile‑iron and PVC piping, force‑main reconnection, and wet‑well lining.
• Comprehensive site work: erosion‑control measures, back‑fill, fencing, lighting, and utility extensions.
• A detailed line‑item cost breakdown, with the largest single expense being the DI piping (~$311 k).