The Oceano Airport AWOS and Beacon Equipment Installation Project involves the installation of an automated weather observing system (AWOS) and a beacon, as well as the removal of the existing beacon. The project includes the installation of necessary cable and conduit, and the performance of electrical connections to make the AWOS and beacon fully operational. The project also includes an additive bid for additional equipment to be installed on the AWOS. The base bid estimate for the project is $337,850.
• The project involves the installation of an AWOS and a beacon
• The project includes the removal of the existing beacon
• The project involves the installation of necessary cable and conduit
• The project includes the performance of electrical connections
• The project has an additive bid for additional equipment