Description
This solicitation calls for the design‑build installation of a comprehensive two‑wire irrigation system for the Wilmington Golf Course. The contractor will supply and install sprinklers, HDPE and PVC pipe, valves, wiring, and a PC‑based central control system, connect to an existing 1500 gpm pump station, perform trenching and directional‑boring, and provide as‑built documentation, warranties, and on‑site training for HDPE fusion.
• Scope includes ~70,000 lf of 2″ HDPE pipe, multiple pipe sizes up to 12″, over 800 sprinkler heads, and a sophisticated control system with weather integration.
• Contractor must meet a 14 % subcontracting goal for certified minority‑owned firms and provide detailed good‑faith effort documentation if the goal is not met.
• Project schedule requires start within 10‑14 days of award and completion within 120 calendar days, with $1,000 per day liquidated damages for overruns.