The contract is for the rehabilitation of the D05 Howe Avenue Storm Drain Pump Station, including the installation of new pumps, electrical systems, and instrumentation. The contract was awarded to Myers and Sons with a bid price of $4,940,000.00. The project involves the furnishing of all labor, materials, and equipment for the rehabilitation of the pump station. Key aspects of the project include:
• Installing four new formed suction inlets in existing wetwells
• Installing four new 700 HP pumps
• Rewinding two existing 400 HP pumps
• Demolishing existing electrical systems and replacing electrical power systems
• Replacing the PLC control panel and furnishing and installing new instrumentation
• Replacing gate operators and installing new actuators at the gravity by-pass gate
• Replacing lighting within the building and on the outside perimeter
• Reconnecting existing miscellaneous site loads
• Demolishing existing gate and fencing fabric and replacing with new 1-inch mesh fabric
• Installing new fence and gates
The contract is expected to be completed within a certain timeframe, but the exact duration is not specified in the document.