This contract involves the replacement of a de‑commissioned kitchen make‑up air handling unit at Manchester Regional Academy. The scope requires removal of the existing unit, installation of a new Reznor RXJ400‑4‑S2y unit of identical performance, utility disconnections/re‑connections, permitting, site cleanup, and a one‑year warranty on labor and workmanship. The project is funded by Manchester Public Schools and was awarded on a sealed‑bid, competitive basis. The awarded vendor, T. P. Aitkin, Inc., will provide all labor, materials, and coordination required to complete the work within the stipulated schedule.
• Replace existing kitchen make‑up air unit with an identical Reznor model (CFM 2,775, 1 HP).
• Perform gas and electric utility disconnections, install new disconnects, and reconnect services.
• Obtain required permits, provide dumpsters, maintain site safety, and deliver final cleaning and warranty documentation.