Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Architecture
  5. ›C-101824 - RFQ 49-24 Design and Engineering for the Bridge…

Awarded contract·City of Vancouver·Washington

C-101824 - RFQ 49-24 Design and Engineering for the Bridge Shelter

Won by Scott Edwards Architecture$1.3MSingle Award
Contract source

Awarded vendors

  • Scott Edwards Architecture

Description

This contract is for the design, coordination, and engineering for a new Bridge Shelter facility, with corresponding planning, site design, and operations considerations for the City of Vancouver and their Operations Partner. The contract includes a scope of work that outlines the specific services to be provided by the Contractor, including conceptual design, site review, pre-planning, and construction documents. The contract also includes a fee schedule and a list of reimbursable expenses. The City of Vancouver is the agency that created and decided to award this contract, and Scott Edwards Architecture is the vendor that was awarded the contract.

Attached files

Key dates

Starts
12/20/2024
Ends
12/31/2026Renews
Duration
2 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310
Solicitation №
C-101824

Contract value

$1,273,504

The contract value is estimated to be $1,273,504.00 USD, which is the maximum compensation for all services including labor, materials, supplies, equipment, and incidentals necessary to complete the services. This estimate is based on the contract document, which states that the payment to the Contractor for the services described in the Agreement shall not exceed $1,273,504.00 USD.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Henry County Board of Commissioners·Georgia

Top match · 73%

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

Georgia Cobb County Department of Transportation·Georgia

72% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Henry County·Georgia

72% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

City of Minot·North Carolina

72% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of The Interior·Wyoming

72% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

Georgia City of Chattahoochee Hills·Georgia

72% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Massachusetts Department of Transportation·Massachusetts

72% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

U.S. Department Of Transportation·Utah

72% match

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Closes 11/19/2026Opened 9/29/2026

Cuyahoga County·Ohio

72% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

MTA - NYC Transit (NYCT)·New York

71% match

CS00055B -Design Services for Various Projects at the RFK Bridge.

Closes 12/10/2026Opened 10/28/2026

Connecticut Dept. of Transportation·Connecticut

71% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of St. Louis·Missouri

71% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Georgia Colquitt County Board of Commissioners·Georgia

71% match

Prison Shelter

Closes 11/2/2026Opened 10/1/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Sacramento County Department of Health Services·California

71% match

Interim Shelter – Bridge Housing Bed Expansion

Closes 12/31/2026Opened 5/4/2026

U.S. Department Of Defense·Kentucky

71% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Casper, Wyoming·Wyoming

71% match

Fire Station No. 2 Outdoor Patio Shelter Improvements

Closes 11/9/2026Opened 10/20/2026

Nelson County·Virginia

71% match

Caboose Protective Cover Structure

Closes 11/10/2026Opened 10/23/2026

City of Casper·Wyoming

71% match

Fire Station No. 2 Patio Shelter Improvements

Closes 11/9/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Wilmington·North Carolina

70% match

HALYBURTON PARK SHELTER #1- FIRE DAMAGE REPAIRS

Closes 11/5/2026Opened 10/1/2026

Cobb County, GA·Georgia

70% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026