Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›2024 Culvert Pipe & Storm Sewer

Awarded contract·Outagamie County·Wisconsin

2024 Culvert Pipe & Storm Sewer

$10MSingle Award
Contract source

Description

The Outagamie County Highway Department issued a 2024 Request for Proposals (RFP) to procure a comprehensive suite of culvert pipe and storm‑sewer materials for county highway projects. The solicitation covers seven distinct product categories—including steel culvert pipe, steel pipe arches, reinforced concrete pipe (circular and horizontal elliptical), non‑metal (plastic) pipe, pipe liners, and prefabricated storm‑sewer structures such as manholes and catch basins—each priced on a unit‑price basis. Vendors submit linear‑foot or per‑item rates, and the department retains the right to award the contract to multiple suppliers, allowing for competitive pricing across the product line. The RFP includes standard provisions, insurance and indemnification requirements, and mandates a 24‑hour response time to material orders. No total contract value or specific awardee is disclosed, but the pricing tables suggest a multi‑million‑dollar material acquisition program. • Covers steel, concrete, and polymer culvert pipe plus related accessories (bands, end sections, joint ties). • Includes unit‑price tables for four pre‑qualified vendors; award outcome not published. • Requires vendor‑provided insurance (general liability, automobile, workers’ comp) and a 5‑day response/delivery window for all orders.

Attached files

Key dates

Bids closed
2/22/2024
Contract modified
2/28/2024
Starts
2/1/2024

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
423830
Solicitation №
HWY CPSS2024

Contract value

$10,000,000

The solicitation contains detailed unit‑price tables ranging from roughly $7 per linear foot for small polyethylene pipe to over $500 per linear foot for large reinforced‑concrete pipe. Assuming the county will need a substantial quantity of material across all categories—roughly 100,000 linear feet combined (a conservative estimate for a county‑wide maintenance program) and an average price of about $100 per foot, the total spend would approach $10 million. Adjusting for higher‑cost items (e.g., concrete pipe) and lower‑cost items (e.g., plastic pipe) could push the value anywhere between $8 million and $12 million. Therefore a reasonable ball‑park estimate for the contract value is approximately ten million dollars.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Shawnee·Kansas

Top match · 72%

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Ladue·Missouri

72% match

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

Delaware County Regional Sewer District·Ohio

71% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

Saline County·Kansas

71% match

2027 Roadway Materials - Pipe Culverts

Closes 11/10/2026Opened 10/9/2026

City of West Des Moines·Iowa

70% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

St. John the Baptist Parish Government·Louisiana

70% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026

Georgia City of Sandy Springs·Georgia

70% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Ann Arbor·Michigan

70% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

City of South San Francisco·California

69% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Lynchburg·Virginia

69% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Marysville, Ohio·Ohio

69% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of South Miami·Florida

69% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

Northeast Ohio Regional Sewer District·Ohio

69% match

CSO-203 Relocation

Closes 11/10/2026Opened 10/6/2026

Spartanburg County Government·South Carolina

69% match

Walnut Church Hill Road Culvert Replacement

Closes 11/10/2026Opened 10/7/2026

City of Lynchburg·Virginia

69% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

West Chester Township·Ohio

69% match

2026 Fall Storm Water Pipe Replacement Bid - West Chester Ohio

Closes 11/5/2026Opened 10/14/2026

Saline County·Kansas

69% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

James City County·Virginia

69% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

Georgia City of Covington·Georgia

69% match

2026-26 Annual Stormwater Rehabilitation and Maintenance Construction Services

Closes 1/12/2027Opened 10/20/2026

City of Bellevue·Washington

69% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Georgia City of Lagrange·Georgia

69% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

Virginia Department of Transportation·Virginia

69% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

Maryland Baltimore County Government·Maryland

69% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

City of Urbana·Illinois

69% match

Miscellaneous Sewer Repairs 2027, Section 26-00718-00-MS

Closes 11/12/2026Opened 10/29/2026

Hastings Utilities·Nebraska

68% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026