Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Waste Removal and Collection
  5. ›Water Plant Operation Monitoring

Awarded contract·The School Board of Charlotte County, Florida·Florida

Water Plant Operation Monitoring

Won by Novak Environmental Services +1 more$11kMultiple Award
Contract source

Awarded vendors

  • Novak Environmental Services
  • US Water Services Corporation

Description

The contract is for water plant operation monitoring services, with the scope of work including furnishing all labor, materials, and services necessary to complete the operation and maintenance of the Category IV, Class C Water Treatment Plant. The contract was awarded to Novak Environmental Services, with a regular monitoring monthly cost of $890.00 and an annual cost of $10,680.00. The contract also includes emergency service response times and labor costs. • The contract includes regular monitoring services • Emergency service response times are 1 hour • Labor costs for emergency services vary depending on the time of day and day of the week • Material costs are invoiced with a 15% markup.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Utilities and Waste Management
NAICS
221310
Solicitation №
13/14-1406SL

Contract value

$10,680

Based on the provided information, the contract value can be estimated as follows: - Regular monitoring annual cost: $10,680.00 - Emergency service labor costs are estimated to be minimal, as they are only incurred in emergency situations. - Material costs are invoiced with a 15% markup, but the total material costs are not specified. Assuming the material costs are a small portion of the overall contract value, a rough estimate of the total contract value would be around $10,680.00 to $20,000.00 per year, depending on the frequency and cost of emergency services and materials.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Commonwealth of Kentucky·Kentucky

Top match · 69%

Water and Wastewater Operations, Maintenance, Monitoring

Closes 11/16/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

67% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

International Boundary And Water Commission: U.S.-Mexico·Texas

66% match

Operations and Maintenance (O&M) Services for the SBIWTP

Closes 1/6/2027Opened 9/25/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Town of Lexington·South Carolina

64% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

U.S. Department Of Veterans Affairs·Washington

64% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

Florida Department of Corrections (FDC)·Florida

64% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

New Jersey Division of Purchase and Property·New Jersey

63% match

T3041 - Wastewater & Water Treatment Plant Operators for the NJDOC

Closes 1/15/2027Opened 10/9/2026

Grand River Dam Authority - GRDA·Oklahoma

63% match

Cooling Water System Performance Monitoring and Chemical Treatment Supply for GREC Units 2, 3 & 4

Closes 11/13/2026Opened 10/20/2026

City of Hollywood·Florida

63% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Dickenson County·Virginia

63% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

62% match

PMP for Water Facilities Circulation Systems

Closes 1/9/2027Opened 12/2/2025

Town of Lexington·South Carolina

62% match

Services for Potable Water System Hydraulic Modeling and Program Management

Closes 11/5/2026Opened 9/16/2026

Upper Occoquan Service Authority·Virginia

62% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

New Jersey Division of Purchase and Property·New Jersey

62% match

T1434 - Operation & Maintenance of Wastewater and Potable Water Treatment Plants - NLDC

Closes 12/11/2026Opened 10/20/2026

City of Hollywood·Florida

62% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Salisbury·Maryland

62% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

62% match

Great Swamp Wetlands Monitoring Services

Closes 11/19/2026Opened 10/9/2026

City of Richland·Washington

61% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

Florida Keys Aqueduct Authority·Florida

61% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026

Eastern Municipal Water District·California

61% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Massachusetts Town of Kingston·Massachusetts

60% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Township of North Brunswick·New Jersey

60% match

Water/Wastewater Consulting Services

Closes 11/13/2026Opened 10/21/2026

Contra Costa Water District·California

60% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

City of Riverside·California

60% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026