The Jadwin Pedestrian Crossing at Catskill Rebid Project is a construction project that aims to enhance pedestrian safety at the crossing of Jadwin Avenue at Catskill Street. The project includes the installation of pedestrian safety enhancing equipment, such as a RRFB system, and final permanent striping. The contract was awarded to two vendors, Construction Ahead Inc DBA and Double J Pavement Surface Excavating Control, with a total bid amount of $361,112.80 and $260,888.00, respectively. The project is estimated to cost $235,000.
• The project includes pedestrian safety enhancing equipment, such as a RRFB system.
• The project includes final permanent striping between Coast Avenue and Van Giesen along Jadwin Avenue.
• The contract was awarded to two vendors, Construction Ahead Inc DBA and Double J Pavement Surface Excavating Control.
• The project is estimated to cost $235,000.
• The City of Richland is responsible for the project and published the bid.