Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›24-41 WTP Electrical Resiliency Construction Project

Awarded contract·Bay County Board of County Commissioners·Florida

24-41 WTP Electrical Resiliency Construction Project

Won by Marshall Brothers Construction & Engineering, Inc.$2.8MSingle Award
Contract source

Awarded vendors

  • Marshall Brothers Construction & Engineering, Inc.

Description

The contract is for the construction of the Water Treatment Plant Electrical Resiliency project in Bay County, Florida. The project involves the replacement of variable frequency drives, a 2500 KVA transformer, duct banks and conduit, wiring, and other appurtenances. The contract is valued at $2,797,384.00 and is scheduled to be completed within 600 calendar days. The contractor is required to provide all necessary labor, supervision, equipment, and supplies to perform the work. The contract also includes provisions for payments, warranties, and insurance. The key aspects of the contract include the scope of work, contract price, payment terms, and the responsibilities of the contractor and the county. • The contract is for the construction of the Water Treatment Plant Electrical Resiliency project. • The project involves the replacement of variable frequency drives, a 2500 KVA transformer, duct banks and conduit, wiring, and other appurtenances. • The contract is valued at $2,797,384.00. • The contract is scheduled to be completed within 600 calendar days. • The contractor is required to provide all necessary labor, supervision, equipment, and supplies to perform the work. • The contract includes provisions for payments, warranties, and insurance. • The contractor is required to cooperate with the county and provide progress reports and other information as requested.

Attached files

Key dates

Starts
10/9/2024
Ends
5/31/2026
Duration
600 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
24-41

Contract value

$2,797,384

The contract value is explicitly stated as $2,797,384.00. This amount is likely based on the scope of work, materials, and labor required for the project. The value may be influenced by factors such as the complexity of the project, the experience and reputation of the contractor, and the availability of materials and labor.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Connecticut Energy & Environmental Protection·Connecticut

Top match · 74%

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Connecticut Energy & Environmental Protection·Connecticut

73% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Connecticut Energy & Environmental Protection·Connecticut

73% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Connecticut Energy & Environmental Protection·Connecticut

72% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Connecticut Energy & Environmental Protection·Connecticut

71% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Palm Beach County Water Utilities Department·Florida

71% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

Palm Beach County Water Utilities Department·Florida

70% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/1/2026

Palm Beach County Water Utilities Department·Florida

70% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·Ohio

69% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

City of Orangeburg·South Carolina

69% match

Utility Transmission & Distribution System Construction & Maintenance

Closes 12/2/2026Opened 10/27/2026

Georgia City of Elberton·Georgia

69% match

Electric Capital Improvement Project South Oliver Line Rehabilitation Project

Closes 12/2/2026Opened 10/23/2026

U.S. Department Of Defense·Ohio

69% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

City of Richland·Washington

69% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

Michigan Rockford Public Schools·Michigan

69% match

Uninterruptible Power Supply

Closes 11/24/2026Opened 10/27/2026

Imperial Irrigation District·California

68% match

Construction Services for Protection Relays Replacement Programs

Closes 11/24/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

68% match

POWER SUPPLY

Closes 11/9/2026Opened 10/9/2026

City of San Diego·California

68% match

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

City of Gallup·New Mexico

68% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

Public Service Company of New Mexico·New Mexico

68% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

U.S. Department Of Veterans Affairs·New York

68% match

Y1DZ--Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction

Closes 11/24/2026Opened 10/6/2026

U.S. Department Of Veterans Affairs·Illinois

68% match

657A5-26-111, Triennial Electrical Testing

Closes 11/9/2026Opened 10/9/2026

Tacoma·Washington

67% match

Electrical Contractors - Prequalification

Rolling / TBD closeOpened 7/26/2025

U.S. Department Of Energy·California

67% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

Georgia City of Covington·Georgia

67% match

2026-28 Electric Infrastructure Reconducts

Closes 11/24/2026Opened 10/26/2026