Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Water and Wastewater
  5. ›Clean Water Plant Phase 3 Improvements

Awarded contract·City of Waukesha·Wisconsin

Clean Water Plant Phase 3 Improvements

$19.5MSingle Award
Contract source

Description

This contract concerns a large‑scale upgrade of a municipal clean‑water treatment plant, encompassing the installation of standby generators, paralleling switchgear, automatic transfer switches, and associated conduit, wiring, and gas‑piping work, as well as demolition of existing roughing filters. The solicitation was issued by the City of Waukesha, Wisconsin, and bids were received on March 28 2025. Four vendors submitted lump‑sum bids ranging from approximately $18.6 million to $20.2 million. The contract type is a lump‑sum (Firm‑Fixed‑Price) award, and the procurement was conducted under full and open competition. No award decision, contract start/end dates, or contractor contact details are disclosed in the tabulation. • Scope: Standby power generation, electrical switchgear, transfer switches, conduit/wiring, gas piping, demolition of roughing filters. • Procurement: Open competition with four bidders; contract to be awarded as a single lump‑sum agreement. • Value: Estimated award amount between $18.6 M and $20.2 M.

Attached files

Key dates

Bids closed
3/28/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
9533498

Contract value

$19,500,000

The bid tabulation lists three concrete lump‑sum offers: $18,600,000 (Lee Mechanical), $19,277,700 (JH Hassinger), and $19,568,033 (Staab Construction), with a higher figure of $20,243,000 also appearing for Staab. Assuming the lowest competitive bid would likely be selected, the award value would be near $18.6 million. However, the presence of a higher $20.2 million figure suggests a potential ceiling. Taking an average of the three disclosed amounts yields roughly $19.15 million, and rounding to a sensible estimate gives about $19.5 million. Therefore, the contract’s estimated value is approximately $19.5 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Bakersfield·California

Top match · 68%

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

City of Charlotte·North Carolina

67% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Upper Occoquan Service Authority·Virginia

67% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Town of Eatonville·Florida

67% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Oregon City of Ashland·Oregon

66% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Hollywood·Florida

66% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Thornton·Colorado

66% match

3MG Clearwell #3

Closes 11/18/2026Opened 6/19/2025

City of Salisbury·Maryland

66% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

City of Holly Grove·Arkansas

65% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

Jackson County Utility Authority·Mississippi

65% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

65% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

Town of Jupiter·Florida

65% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

City of Douglas·Wyoming

65% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Santa Maria-Bonita School District·California

65% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Manatee County - Purchasing Division·Florida

64% match

SEWRF 3rd Sludge Holding Tank

Closes 11/16/2026Opened 9/9/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

U.P. Engineers & Architects, Inc·Michigan

64% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

City of Riverside·California

64% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026

City of Eureka Springs·Arkansas

64% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Douglas·Wyoming

64% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Kyle·Texas

64% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

City of Neptune Beach·Florida

64% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

The University of North Carolina·North Carolina

64% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026