The contract is for the replacement of a 5-ton HVAC unit at the Logan Booster Building A, which has catastrophically failed and cannot be repaired. The replacement will be provided by Sherman Mechanical Contractors at a cost of $16,369.84. The contract is considered an emergency due to the need for a fully staffed office building to have a functioning cooling system. Key aspects of the contract include:
• The replacement of the HVAC unit is urgent due to the unit's failure and the need for a functioning cooling system in the office building.
• The contract was awarded to Sherman Mechanical Contractors, who provided a quote for the replacement.
• The cost of the replacement is $16,369.84.
• The contract is classified as an emergency procurement.
• The contract duration is 31 days.