The City of Tucson has awarded a contract to BFL Construction for the construction of a new 10,000 square-foot steel metal shell building at the Los Reales Sustainability Campus. The project includes all utility connections and stub-outs, an adjacent 1,000 square-foot concrete pad, site work, and other miscellaneous incidental work. The contract has a duration of approximately 548 days, starting from August 22, 2024, and ending on February 21, 2026. The contract value is estimated to be between $1,000,000 and $5,000,000. Key aspects of the project include earthwork, concrete paving, and protection of the site from damage during construction. The City of Tucson has set a goal of 10% SBE participation in the project. Some of the key features of the project include:
• Construction of a new 10,000 square-foot steel metal shell building
• All utility connections and stub-outs
• An adjacent 1,000 square-foot concrete pad
• Site work, including paving, curbing, landscaping, and irrigation
• Protection of the site from damage during construction
• Earthwork, including excavation and backfill
• Concrete paving, including sidewalks, dumpster pads, and other flatwork.