The contract is for the Fairmount Road Culvert Repairs project, which includes extending existing twin 60” RCP, constructing a new modified “C” headwall, Class II riprap placement, stream diversion, and maintenance of stream flow. The cost estimate for this project is between $101,000.00 and $500,000.00. The contract was awarded to CJ Miller for $179,500.00.
• The project requires prequalification with the Bureau of Engineering.
• The bid submission date was February 5, 2020.
• A pre-bid conference was held on January 21, 2020.
• The contract award date was July 15, 2020.