This contract concerns the comprehensive replacement of the existing water distribution mains in the Capitol Avenue area of Hartford, Connecticut. The work includes installing approximately 9,380 linear feet of 8‑inch and 12‑inch ductile‑iron water mains, associated appurtenances, new fire hydrants, water service transfers, and meter pits along multiple streets (including Capitol Avenue, Beacon Street, Natalie Street, Rowe Avenue, Dorothy Street, Ashton Street, James Street, Heath Street, Amity Street, and South Whitney Street). The scope also covers all labor, equipment, permits, and related costs required to complete the installation. A mandatory pre‑bid conference was held on February 23 2023, and bids were due by March 17 2023. The award was recorded on December 12 2024, though the winning vendor(s) are not listed.
• Replacement of aging water mains with new ductile‑iron pipe (≈9,380 LF).
• Includes new hydrants, appurtenances, and meter pit installations.
• Work location: City of Hartford, CT across numerous streets.
• Mandatory pre‑bid conference required attendance.
• Award status: Awarded (vendor not disclosed).