The City of Keene is replacing two existing primary sludge pumps, installing one new dual-purpose primary sludge/scum pump, replacing one existing secondary scum pump, and replacing one existing RV waste pump at the wastewater treatment facility. The project also includes the installation of one new variable frequency drive for the dual-purpose primary sludge/scum pump. The contract was awarded to Weston & Sampson CMR, Inc. with a total bid of $432,391.00.
• The project involves the replacement of existing pumps and the installation of new ones.
• The project includes the installation of a variable frequency drive for the dual-purpose primary sludge/scum pump.
• The contract was awarded to Weston & Sampson CMR, Inc.
• The total bid amount is $432,391.00.