The contract is for main line lining for root mitigation, project 3, and includes cleaning, television inspection, and installation of cured-in-place pipe for 25,708 lineal feet of 6-inch diameter main line and 335 lineal feet of 8-inch diameter main line. The contract also includes reinstatement of approximately 603 lateral taps, removal and replacement of 11 flusher branches and five lower laterals. The engineer's estimate for the project is $1,490,000.00.
• The contract was awarded to Insituform Technologies with a bid of $1,291,507.80.
• The contract is for construction services.
• The project includes multiple tasks such as cleaning, television inspection, and installation of cured-in-place pipe.
• The engineer's estimate for the project is $1,490,000.00.
• The contract was bid on by multiple vendors, including NorCal Pipeline Service, Southwest Pipeline, SAK Construction, and Michels Pipeline Construction.