Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›MAIN LINE LINING FOR ROOT MITIGATION - PROJECT 3

Awarded contract·County of Sacramento - Construction·California

MAIN LINE LINING FOR ROOT MITIGATION - PROJECT 3

Won by Insituform Technologies$1.3MSingle Award
Contract source

Awarded vendors

  • Insituform Technologies

Description

The contract is for main line lining for root mitigation, project 3, and includes cleaning, television inspection, and installation of cured-in-place pipe for 25,708 lineal feet of 6-inch diameter main line and 335 lineal feet of 8-inch diameter main line. The contract also includes reinstatement of approximately 603 lateral taps, removal and replacement of 11 flusher branches and five lower laterals. The engineer's estimate for the project is $1,490,000.00. • The contract was awarded to Insituform Technologies with a bid of $1,291,507.80. • The contract is for construction services. • The project includes multiple tasks such as cleaning, television inspection, and installation of cured-in-place pipe. • The engineer's estimate for the project is $1,490,000.00. • The contract was bid on by multiple vendors, including NorCal Pipeline Service, Southwest Pipeline, SAK Construction, and Michels Pipeline Construction.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
4304

Contract value

$1,291,508

The contract value can be estimated based on the apparent low bid of $1,291,507.80 submitted by Insituform Technologies. This value is likely to be the contract value, as it is the lowest bid submitted. Additionally, the engineer's estimate for the project is $1,490,000.00, which provides a rough estimate of the project's value. However, the actual contract value is likely to be closer to the apparent low bid.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

New Orleans Regional Transit Authority·Louisiana

Top match · 66%

Tree Cutting Streetcar Line & Vegetation Clearance

Closes 11/17/2026Opened 10/15/2026

The University of North Carolina·North Carolina

65% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Terrebonne Parish Consolidated Government·Louisiana

65% match

RFP 26-ELTDIST-24 (Re-Advertisement) Power Line Right of Way Clearance & Tree Trimming

Closes 11/23/2026Opened 10/28/2026

Catawba Regional Council of Governments·South Carolina

65% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

65% match

Vegetation Control_Embankments, Weed Control Railroad Tracks, USAG Bavaria

Closes 11/2/2026Opened 10/1/2026

City of Grand Rapids Department of Engineering·Michigan

65% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

U.S. Department Of Defense·South Dakota

64% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

City of Charlotte·North Carolina

64% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

Louisiana Regional Transit Authority·Louisiana

64% match

Tree Cutting Streetcar Line & Vegetation Clearance

Closes 11/17/2026Opened 10/26/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

64% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

City of Des Moines - Iowa·Iowa

64% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Torrance·California

64% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

64% match

Request for Information – Sinkhole Remediation

Rolling / TBD closeOpened 5/13/2026

Saline County·Kansas

64% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Napa·California

64% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

City of Columbus Ohio·Ohio

64% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Charlotte·North Carolina

64% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Ann Arbor·Michigan

64% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

El Dorado Irrigation District·California

64% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

City of Lake City and City of Bellechester·Minnesota

64% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Texas Midwestern University·Texas

64% match

RFP Tunnel Surface Improvement Project

Closes 11/12/2026Opened 10/14/2026

City of Anderson·South Carolina

63% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

East Bay Municipal Utility District·California

63% match

Local Watershed Tree Planting Maintenance and Monitoring

Closes 11/17/2026Opened 10/14/2026

City of Charlotte·North Carolina

63% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Seattle·Washington

63% match

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026Opened 10/14/2026