This contract is for the provision of network switching equipment, wireless performance sensors and dashboard, and network switch and wireless access point installation assistance. The contract was awarded to Ednetics, with a total cost of $2,971,039.24. The evaluation criteria included eRate eligible purchase cost, eRate in-eligible purchase cost, support capabilities, and ability of the district to manage and maintain the products. The contract was issued by the Spokane Public Schools, with Lisa Palmer as the bid contact.
• The contract includes the provision of Layer 2 and Layer 3 switches, switch optics, and wireless performance monitors.
• The evaluation criteria included the cost of the equipment, support capabilities, and compatibility with existing infrastructure.
• The contract was awarded based on a competitive bidding process, with Ednetics being the awarded responsive vendor.