The City of Cincinnati is seeking a prime contractor to design, furnish, install, and operate a new electric‑vehicle (EV) fast‑charging station at the Mt. Washington location (PID 121831). The contract includes a 30‑day on‑site construction window, a 5‑year operations & maintenance (O&M) period, and coordination with Duke Energy for utility work. The scope covers site preparation, concrete pads, conduit, bollards, installation of a DC fast‑charging unit (baseline 100 kW, optional 150 kW), electrical distribution equipment, pavement markings, signage, data reporting, and eventual demolition after the O&M term. The bidder must provide bid and performance bonds, comply with Davis‑Bacon wage rules, submit a Statement of Qualifications, and meet various insurance and EEO requirements.
• Install EV‑charging hardware (DCFC charger, panel, meter socket, transformers) and related civil works (concrete pads, conduit, bollards, pavement markings).
• Provide 5‑year O&M services ensuring ≥ 97 % uptime, 24/7 driver support, and quarterly/annual data reporting.
• Coordinate utility work with Duke Energy, handle permits, and perform end‑of‑life demolition and site restoration.