The City of Redding is seeking a qualified contractor to widen the Canyon Road bridge over the Anderson‑Cottonwood Irrigation Canal and reconstruct the approach roadway. The work includes demolition of portions of the existing bridge, construction of new bridge widening, roadway excavation, paving, utility relocation, storm‑water pollution controls, traffic‑control installations, and associated environmental compliance measures. This is a lump‑sum public‑works contract with a total estimated value around $3 million and a required completion period of 180 working days after notice to proceed.
• Bridge widening (approx. 11.5 ft added, total width 40 ft) with new abutments, piers, and wingwalls
• Roadway reconstruction: excavation, back‑fill, asphalt overlay, curb & gutter, sidewalks, and retaining walls
• Utility work: removal and replacement of 8‑in. and 16‑in. waterlines, installation of ductile‑iron pipe, valve assemblies, and coordination of gas, telecom, and city utilities
• Environmental and safety requirements: lead compliance plan, asbestos handling, storm‑water BMPs, traffic‑control systems, and required certifications (Class A contractor license, prevailing‑wage Davis‑Bacon rates, EO 13658 minimum‑wage floor)