Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Engineering Services
  5. ›PHOENIX SKY HARBOR INTERNATIONAL AIRPORT WEST TERMINAL…

City of Phoenix·Arizona

PHOENIX SKY HARBOR INTERNATIONAL AIRPORT WEST TERMINAL PARKING ENABLING

Closes 9/11/2026$500k – $1MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Phoenix Aviation Department is seeking a qualified consulting firm to provide full‑service engineering support for two new surface parking facilities (6,000 stalls and 1,300 stalls) that will enable the new West Terminal at Phoenix Sky Harbor International Airport. The scope covers programming, preliminary and final design, bid‑phase services, and optional construction administration and inspection. The work will be performed under a Design‑Bid‑Build delivery method and must meet LEED, ADA, and airport‑specific requirements, including stormwater, utility coordination, EV charging, and wayfinding integration. The consultant will also manage the use of the City’s UNIFIER project‑management system and may be required to attend a pre‑submittal meeting on August 31, 2026. • Design of two commercial asphalt parking lots (≈ 7,300 total stalls) • Programming, schematic, design‑development, and construction‑document phases • Coordination with FAA, City utilities, environmental agencies, and airport operations • Preparation of LEED‑compliant documentation and sustainability reporting • Optional construction administration, inspection, and warranty services (≈ 11½ months) • Required deliverables: drawings, specifications, cost estimates, bid packages, and as‑built documentation • Estimated construction cost: $50 million; consulting fee typically 1‑2 % of construction cost.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lynette Chavez(Contracts Specialist)

[email protected]

(602) 534-5789

Key dates

Opened
8/20/2026
Questions due
9/4/2026
Pre-bid meeting
8/31/2026
Closes
9/11/2026

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
AV15000082

Budget estimate

$500,000 – $1,000,000

The solicitation does not disclose a consulting fee. Based on typical public‑sector design contracts for a $50 M construction project, engineering and design services usually range from 0.8 % to 2 % of construction cost. Applying that range yields an estimated fee between $400,000 and $1,000,000. The final amount will depend on the scope selected (design only vs. design‑plus‑construction administration) and negotiated fee structure.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tampa International Airport·Florida

Top match · 65%

Parking Facilities Management Services

Closes 11/23/2026Opened 10/27/2026

Franklin County Board of County Commissioners·Florida

65% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

Hillsborough County Aviation Authority·Florida

64% match

Parking Facilities Management Services

Closes 11/23/2026Opened 10/28/2026

San Francisco International Airport·California

62% match

Terminal 3 Boarding Area E Travel Convenience Store Lease, a Small Business Set-Aside

Closes 11/18/2026Opened 6/5/2026

San Francisco International Airport·California

62% match

Private Terminal Ground Lease

Closes 1/27/2027Opened 5/20/2026

San Francisco International Airport·California

62% match

Terminal 3 East Video Game Lounge Lease

Closes 11/24/2026Opened 11/17/2026

City and County of San Francisco·California

61% match

EXT AIR | Private Terminal Ground Lease

Closes 1/27/2027Opened 5/20/2026

Port of Portland·Oregon

61% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

City of Redding·California

61% match

5733 - Redding Municipal Airport Rental Car Concession

Closes 11/5/2026Opened 10/2/2026

City of Austin·Texas

60% match

Airport Parking Management Operations

Closes 11/10/2026Opened 10/5/2026

Franklin County Courthouse Annex·Florida

60% match

ITB-West Hangar Development Project

Closes 12/16/2026Opened 10/29/2026

City of St. Joseph·Missouri

60% match

D-1 Aircraft Hangar Lease

Closes 11/3/2026Opened 10/2/2026

State of Alaska·Alaska

60% match

RFP #110526 Parking Infrastructure Operations and Management Services

Closes 11/5/2026Opened 10/5/2026

Calhoun County Board of County Commissioners·Florida

59% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Bill and Hillary Clinton National Airport·Arkansas

59% match

Parking Guidance System

Rolling / TBD closeOpened 4/14/2026

City of Key West·Florida

59% match

Public Transportation Grant – Park and Ride Garage

Closes 11/4/2026Opened 9/10/2026

City of Augusta, GA (Augusta Commission)·Georgia

59% match

VIP Parking Lot

Closes 12/3/2026Opened 10/29/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

59% match

ADA-32702 Wulik-Delong LLC. Successive Lease

Closes 11/12/2026Opened 10/13/2026

City of Prescott·Arizona

59% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

Port of Portland·Oregon

59% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Mississippi Gulfport Redevelopment Commission·Mississippi

59% match

Parking Management/Leasing for a Parking Garage

Closes 11/3/2026Opened 10/30/2026

Port of Portland·Oregon

59% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

City of Phoenix·Arizona

59% match

Airport Technology Consulting Services

Closes 12/3/2026Opened 10/13/2026

Los Angeles World Airports·California

59% match

RFP for Lease Opportunity of Property at 6201 West Imperial Highway (Personal Services)

Closes 11/11/2026Opened 10/5/2026

Virgin Islands Port Authority·U.S. Virgin Islands

59% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026