The Indian Health Service, Kayenta Health Center, requires the installation of a new cooling system to replace the existing one. The new system should be capable of maintaining a temperature of 20°C ± 2°C and a humidity level of 45% ± 5% RH. The system should also be designed for low-ambient operation and have a redundant configuration. The contractor should provide all necessary labor, materials, and equipment to complete the project. The project should be completed within 146 days.
• The new cooling system should have a capacity of approximately 6 tons per unit.
• The system should have integrated humidity control and dehumidification capabilities.
• The system should have a variable-speed condenser fan and a low-ambient control package.
• The contractor should provide as-built drawings, O&M manuals, and training upon project completion.
• The contractor should demonstrate experience with similar projects and have a minimum of three comparable projects within the last five years.
• The contractor should have a valid EPA Section 608 certification for refrigerant handling.