The contract calls for a contractor to provide all labor, materials, and equipment to clean, disassemble/reassemble, and inspect the lifting machinery of the Barkley Lock Emergency Lift Gate. The work includes detailed inspections of limit switches, motors, gears, drums, sheaves, wire rope, brakes, bearings, couplings, and control equipment, followed by documentation (inspection reports with photos, as‑built reports, and touch‑up painting). New oil, grease, filters, fasteners, and other consumables are also required to return the emergency gate machinery to operational condition.
• Comprehensive mechanical inspection and cleaning of emergency lift gate components.
• Disassembly, reassembly, and painting of all exposed surfaces; optional painting after contract options are exercised.
• Delivery of detailed reports (initial inspection, as‑built, photos) and provision of consumables (oil, grease, filters, fasteners).