The Taylor School District is seeking a qualified contractor to perform comprehensive HVAC (Heating, Ventilation, and Air‑Conditioning) upgrades at Hoover Middle School, 27101 Beverly Rd, Taylor, MI. The scope includes demolition of existing mechanical, electrical, and roof‑mounted equipment, removal of associated ceilings, fixtures, and plumbing, and installation of new HVAC systems, electrical power and lighting, and related controls. Work must be coordinated with the school’s operations, adhere to local Authority Having Jurisdiction (AHJ) permitting requirements, and protect existing services not slated for removal. The contractor is responsible for field verification, disposal of demolished materials, and ensuring all new work complies with code and design specifications. The project is issued for bidding on 08‑Nov‑2026 and requires submission of detailed plans, schedules, and compliance documentation.
• Demolition of existing MEP systems (mechanical, electrical, roof equipment) across multiple building areas (first floor, roof, balcony).
• Installation of new HVAC units, ductwork, condensers, and associated controls.
• New electrical power distribution, lighting, panel schedules, and one‑line diagrams.
• Coordination of roof penetrations, structural supports, and compliance with accessibility standards.
• Submission of shop drawings, permit sets, and field‑verified quantities.