Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Manufacturing
  5. ›Water Meters, Registers, and Other Hardware FY27

City of Cambridge·Massachusetts

Water Meters, Registers, and Other Hardware FY27

Closes 9/24/2026$500k – $1.2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cambridge is soliciting sealed bids to supply a variety of water meters, registers, and related hardware for its FY27 meter‑replacement program. The contract will cover positive‑displacement, turbine, ultrasonic, and fire‑hydrant meters in sizes ranging from 5/8" to 6". All meters must meet current AWWA standards, be lead‑free, and be compatible with the city’s Aclara RF AMR system (minimum 99.95% accuracy, 6‑sigma preferred). Delivery is FOB to the Cambridge Water Department receiving area with a 30‑day lead time; the city will not pre‑pay and will pay upon milestone completion. The award will go to the lowest responsive and responsible bidder, with contracts expected to be signed within 45 days of bid opening. Multiple separate contracts may be awarded for each meter type and size. • Bid submission deadline: 11:00 am, Sept 24 2026 (electronic via e‑Procurement portal) • Questions due: 11:00 am, Sept 10 2026 • Required warranties: 1 year for meters, 15 years for registers • Minimum experience: 10 years manufacturing, 5 years supplying, references from ≥3 MA municipalities • Delivery location: 250 Fresh Pond Parkway, Cambridge, MA • Estimated quantity: ~700 meters across all categories

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Belmain(Purchasing Agent)

[email protected]

(617) 349-5568

Key dates

Opened
9/3/2026
Questions due
9/10/2026
Closes
9/24/2026
Duration
1 year

Last updated

Details

Type
Invitation for Bid
Industry
Manufacturing
NAICS
423830
Solicitation №
COC-IFB-FY27-31159

Budget estimate

$500,000 – $1,200,000

The bid includes roughly 630 positive‑displacement meters, 70 ultrasonic meters, 10 fire‑hydrant meters, and 3 turbine meters—totaling about 713 units. Assuming an average unit price of $800 (lower for basic PD meters, higher for ultrasonic and turbine models) the material cost alone is ~ $570,000. Adding required registers, warranties, delivery, and administrative fees could raise the contract value to between $600,000 and $1.2 million. The final budget will depend on the actual quantities ordered, unit mix, and any negotiated volume discounts.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Kingston·Massachusetts

Top match · 74%

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

City of Charlotte·North Carolina

73% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Bedford, TX·Texas

71% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Winnebago·Minnesota

71% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

City of Gould·Arkansas

71% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

City of Holly Grove·Arkansas

71% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

LA County Internal Services Department·California

71% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

Arlington County Government·Virginia

70% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

Connecticut Metropolitan District Commission·Connecticut

70% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Little Blue NRD·Nebraska

69% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

City of Phoenix·Arizona

69% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

City of Folsom·California

69% match

CITY OF FOLSOM: VARIOUS WATER METER PROCUREMENT CONTRACTS

Closes 11/13/2026Opened 9/24/2026

City of Punta Gorda·Florida

69% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Boca Raton·Florida

68% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Georgia Jones County Board of Commissioners·Georgia

68% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

City of Boca Raton·Florida

68% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Cambridge·Massachusetts

68% match

FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Veterans Affairs·Washington

68% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

City of Seattle·Washington

68% match

Small Single & Multi-Jet Cold Water Meters

Closes 11/18/2026Opened 9/30/2026

City of Pasadena·California

68% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

Alabama Office of the Chief Procurement Officer·Alabama

68% match

FY26-27 Water Service

Closes 11/3/2026Opened 10/30/2026

Michigan

67% match

938-17-16 - Verification, Preventative Maintenance, and Repair Services - Flow Meters

Closes 11/2/2026Opened 10/12/2026

Washington Suburban Sanitary Commission, MD·Maryland

67% match

Furnish and Deliver Small and Large Water Meters

Closes 11/2/2026Opened 9/21/2026

City of Bartow, FL·Florida

67% match

Water & Wastewater Utilities Supplies, Parts & Equipment

Closes 5/30/2029Opened 5/16/2025

City of Aumsville·Oregon

67% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026