This solicitation calls for the demolition of an existing medical administration trailer and the construction of a new 1,000 SF addition at the Norfolk Sheriff’s Office in Dedham, MA. The work includes a new concrete slab, painted concrete block walls, steel roof joists, PVC membrane roofing, and interior fit‑out (nursing station, kitchenette, offices). Five specialty sub‑bids are required—masonry, roofing & flashing, metal windows, HVAC, and electrical—each with listed prices and usage restrictions. Bidders must be DCAMM‑certified, execute a confidentiality agreement, and submit their bids electronically through the DCAMM E‑Bid Room. The contract duration is 60 calendar days, and the estimated construction cost is $1,282,458.
• Demolition & removal of existing trailer, new slab and 1,000 SF addition
• Sub‑bids required for masonry, roofing, metal windows, HVAC, and electrical (prices disclosed)
• Mandatory confidentiality agreement; all bids submitted via DCAMM E‑Bid Room by 5/21/2026 2 PM EDT
• Project timeline: 60‑day construction period; estimated cost ≈ $1.28 M